Skip to content
The process

Six steps. One site day.

Everything slow about a sump — mixing, pouring, curing, testing — already happened in our factory. On your site, we just install.

Watch it install

One sump. One day.
Start to finish.

Site clock · Day 1 04:30 PM
PRECON Installed. Ready to fill. DAY 1 · 4:30 PM

Ready to fill

Done by evening. Turn on the water the same day — no 15-day curing wait.

  1. Day −3

    Call or WhatsApp

    Share your location, plot details and water needs. We give you a capacity recommendation and a fixed quote.

    Most quotes are shared the same day. No obligation.

  2. Day −2

    Site visit & sizing

    Our engineer checks access, soil and the best location, and marks exact pit dimensions.

    We confirm crane/truck access so installation day has zero surprises.

  3. Day 0

    Pit excavation

    The pit is dug to our marked dimensions with a levelled bed ready for the tank.

    Done by your contractor or coordinated through us.

  4. Day 1 · AM

    Delivery & placement

    The cured, inspected M40 tank arrives from our Poonamallee factory and is craned into the pit.

    Placement and levelling typically take a few hours, not days.

  5. Day 1 · PM

    Connections & backfill

    Inlet, outlet and overflow connections are made, the lid is set and the pit is backfilled.

    Your plumber can connect immediately — no curing wait.

  6. Day 1 · Done

    Ready to fill

    That’s it. A finished, leak-proof sump — backed by a 30-year warranty.

    Your site moves on to the next job tomorrow morning.

Seen on YouTube

Don’t take our word for it. Watch it go in.

Independent creators filmed Precon sumps being delivered and installed on real Tamil Nadu sites.

Readymade concrete sump for home & commercial buildings

Mano's Try · Tamil

Readymade sump, precast water tank — installed on site

Mano's Try · Tamil

Budget-saving homes: the ready-made sump explained

Engineer Vasanth · Tamil

Side by side

Site-cast vs. Precon. It isn’t close.

Feature Site-cast sump Precon M40
Installation time 7–15 days 1 day
Construction joints Base-to-wall cold joints None — monolithic
Leakage risk High, worsens over time Leak-proof by design
Concrete grade M20 (often lower on site) M40, factory-verified
Quality control Depends on the mason Controlled mix, vibration & curing
Curing wait 7–14 days of watering Already cured at factory
Site disruption Shuttering, steel, mixers for weeks A few hours of crane work
Cost certainty Variable — labour, rework, extras One fixed price
Warranty Rarely any 30 years
Your move

Your site is waiting.
Your sump doesn’t have to.

Get a fixed quote today. Book installation this week. Fill your tank the same evening.

Talk to an engineer86 8000 8999
Or WhatsApp your plot details
Free quote · 60 seconds

Tell us about your project

1/2

I am a

Capacity needed

When do you need it?

Your number is only used to send your quote. No spam.

Call WhatsApp Get Quote