Talk to an engineer, not a call centre.
Call, WhatsApp or visit our Poonamallee factory. Share your plot details and we’ll recommend the right size the same day.
No. 68, Rajeshwari Nagar, Malayambakkam Road, Poonamallee, Chennai – 600 056
Mon–Sat · 9:00 AM – 7:00 PM
Straight answers.
Still unsure? Call us — an engineer, not a call centre, picks up.
Once the pit is excavated, placement, levelling and connections are completed in a single day. A conventional cast-in-situ sump typically takes 7–15 days including shuttering, pouring, de-shuttering and curing.
Precon sumps are cast as one monolithic unit in steel moulds, so there are no construction joints between the base and walls — the most common leak point in site-cast sumps. Dense, vibrated M40 concrete also has far lower permeability than typical site mixes.
M40 means the concrete is designed for a characteristic compressive strength of 40 N/mm² at 28 days. Most site-cast sumps are specified at M20 — half that strength — and real site results often fall below specification.
Usually not, once you count everything. Site-cast sumps carry hidden costs: shuttering, skilled labour for 1–2 weeks, curing water, waterproofing, supervision and rework when leaks appear. Precon gives you one fixed price.
We deliver and install across Chennai and Tamil Nadu from our Poonamallee facility. Call us with your location for delivery feasibility and timelines.
We guide you on exact pit dimensions during the site visit. Excavation can be arranged by your contractor or coordinated through us — ask during your quote.